Major Canadian Infrastructure Projects and Their Hiring Needs

Major Canadian Infrastructure Projects and Their Hiring Needs

In my career I have watched a number of very large projects arrive in a city, and the pattern is always the same. First comes the announcement, and everybody in the profession starts asking whether it is “real”. Then a long quiet period follows, during which engineers and consultants quietly win the early work. Then, usually later than anyone expected, the hiring wave arrives, and it arrives in a specific order: survey and GIS first, then civil and structural design, then the discipline coordinators, then the detailers and checkers, and finally, in the construction phase, the field engineers and the people who keep the as-built records. The designers who understood that order, and positioned themselves a year ahead of it, did very well. Those who waited for the job ads were late.

That is the purpose of this report. It does not predict hiring. It does something more useful: it identifies the large public and nation-building projects in Canada, tells you what stage each one is at as far as I can verify, and explains, as my professional judgment, which CAD, BIM and GIS roles each type of project tends to need and in what sequence.

I want to be careful about one thing. Nobody publishes a list of drafting jobs created by each project. The project values, schedules and job estimates below come from public sources. The mapping from project type to hiring needs is my inference, based on how projects of each kind are designed and delivered. I mark each one clearly.


The Short Answer

  • The federal Major Projects Office has announced 28 nation-building initiatives: 18 projects representing more than $194 billion in new investment and an estimated 200,000 jobs per year during construction, plus 10 transformative strategies (Budget 2026 overview).
  • ReNew Canada’s 2026 Top100 report puts the total value of Canada’s largest public infrastructure projects at $343 billion, an increase of $43 billion in a year, with 12 new projects worth $70 billion joining the list.
  • Nuclear and transit lead. Nuclear projects hold four of the top six places on the list, and new transit projects such as Calgary’s Green Line, Toronto’s Yonge North Subway Extension and the Alto high-speed rail network joined it.
  • Not every announced project is under construction. Alto high-speed rail, for example, is at an early development stage, with a cost estimated by its CEO at $60 billion to $90 billion.
  • For CAD, BIM and GIS professionals, the strongest near-term demand is likely in Ontario and Québec transit and nuclear programs, and in western energy and transmission projects. Where the projects are is not the same as where the hiring happens, and I explain why below.

For the labour-market side, see State of CAD, BIM and GIS Hiring in Canada.


The Biggest Projects by Reported Value

ProjectWhereReported valueNote
Alto high-speed rail (Toronto to Québec City, about 1,000 km)Ontario and Québec$60 billion to $90 billion (CEO estimate)Early development stage; referred to the Major Projects Office
Darlington New Nuclear ProjectBowmanville, Ontario$20.9 billionReferred to the Major Projects Office
Peter Gilgan Mississauga HospitalMississauga, Ontario$14.0 billionLarge health-care building
Bruce Power RefurbishmentOntario$13.0 billionNuclear refurbishment
Darlington Nuclear RefurbishmentOntario$12.8 billionNuclear refurbishment
Ontario LineToronto, Ontario$11.0 billionTransit
GO Expansion, Early WorksGreater Toronto area$10.5 billionRail expansion
Réseau express métropolitain (REM)Greater Montréal$9.4 billionTransit
Montréal Metro Blue Line East ExtensionMontréal, Québec$7.6 billionTransit

Values as reported in ReNew Canada’s 2026 Top100 Projects report (via ConstructConnect) and, for Alto, by the project CEO (via The Globe and Mail). They are capital cost estimates.

Horizontal bar chart of the capital value of eight large Canadian infrastructure projects from ReNew Canada's 2026 Top100 list, with the Alto high-speed rail estimate shown as a range

The values come from ReNew Canada’s 2026 Top100 Projects report, as reported by ConstructConnect, except for Alto, whose estimate comes from the project’s CEO as reported by The Globe and Mail. A “value” is a capital cost estimate. It is not a measure of design hours, and it does not tell you how long the work will last.


The Federal Major Projects Office List

The Major Projects Office was created in 2025 to speed up approvals for projects of national interest. As of the Budget 2026 overview, the projects and strategies announced include the following. This is a list of referred projects, which means they are being fast-tracked through review. It does not mean construction has started.

Project or strategySectorLocation
LNG Canada Phase 2EnergyKitimat, British Columbia
Ksi Lisims LNGEnergyPearse Island, British Columbia
North Coast Transmission LineElectricity transmissionBritish Columbia
Red Chris Mine ExpansionMiningBritish Columbia
Roberts Bank Terminal 2PortBritish Columbia
Port of Vancouver Gateway StrategyPort strategyBritish Columbia
Mackenzie Valley HighwayTransportationNorthwest Territories
Taltson Hydro ExpansionElectricityNorthwest Territories
Arctic Economic and Security CorridorCorridor strategyNorthern Canada
Northwest Critical Conservation CorridorCorridor strategyYukon
McIlvenna Bay Foran Copper MineMiningSaskatchewan
Canada Nickel’s Crawford ProjectMiningTimmins, Ontario
Darlington New Nuclear ProjectElectricityBowmanville, Ontario
Alto High-Speed RailTransportationOntario–Québec corridor
Contrecoeur Container Terminal ProjectPortQuébec
Nouveau Monde Graphite’s Matawinie MineMiningQuébec
Labrador Trough Clean Power, Critical Minerals and Infrastructure CorridorCorridor strategyQuébec and Labrador
Northcliff Resources’ Sisson MineMiningNew Brunswick

Selection of items named in the federal Budget 2026 overview and Major Projects Office materials. The full list changes as projects are added; check the Major Projects Office for the current version.

Three cautions.

  1. Referral is not construction. Some of these projects are in planning, regulatory review or financing stages.
  2. Counts change. An earlier federal document listed 15 projects representing over $125 billion; the later overview lists 18 projects and more than $194 billion. The list is evolving.
  3. Job estimates are estimates. The 200,000 jobs a year figure is a federal estimate for construction employment overall, not for design or drafting roles.

How Project Type Translates Into CAD, BIM and GIS Work

Here is the part that is my own judgment, and where my years of managing project teams are the evidence. Each type of project draws on a different mix of roles and tools. These are patterns, not forecasts.

Project typeEarly phase: roles in demand firstDesign phaseLater phasesTools often seen
Nuclear new build and refurbishmentSite survey, GIS, document control setupMechanical, piping, electrical and instrumentation design; 3D plant models; configuration managementAs-built records, modification packages, outage supportAutoCAD, 3D plant design tools (for example AutoCAD Plant 3D, AVEVA, Smart 3D), Navisworks
Rail, transit and high-speed railGIS, survey, alignment and utilities dataCivil, structural, utilities relocation, station architecture and systems coordinationBIM coordination, as-builts, asset handoverCivil 3D, MicroStation or OpenRoads, Revit, Navisworks, ArcGIS Pro
Transmission lines and substationsGIS, route selection, surveyLine design, civil and structural, protection and control drawingsAs-builts and asset GISLine design software (for example PLS-CADD), Civil 3D, ArcGIS Pro
LNG, energy and processing facilitiesSite survey and GISPiping, process, structural steel, electrical; isometricsDetailing, shop drawings, document control3D plant design tools, Tekla or Advance Steel for steel, AutoCAD
Mines and critical mineralsGIS, survey, environmental dataCivil, structural, mechanical, tailings and site layoutAs-builts, modificationsCivil 3D, AutoCAD, GIS tools
Ports and terminalsGIS, survey, marine dataCivil, marine, structural and utilitiesCoordination and as-builtsCivil 3D, Revit, Navisworks
Roads, highways and northern corridorsGIS, survey, environmental mappingCivil design, drainage, bridgesAs-builts and asset recordsCivil 3D, ArcGIS Pro
Hospitals and large buildingsSite and context dataArchitectural, structural and MEP BIM with strong coordinationFacility data handoverRevit, Navisworks, common data environments
Northern hydro and remote energyGIS and surveyCivil, structural and mechanical for remote sitesAs-builts and operations recordsCivil 3D, Revit, ArcGIS Pro

This table is my professional judgment about how projects of each type are usually designed and delivered. It is not a count of jobs and not a forecast.

A few notes on the table.

Early phases favour GIS and survey. Corridors, transmission lines, rail and roads begin with route selection, land and environmental data. People who can integrate survey, GIS and CAD data are needed first and are often scarce.

Design phases favour civil, structural and discipline coordinators. This is where the largest drafting teams assemble, and where BIM coordination earns its keep, especially on stations, hospitals and nuclear facilities.

Detail and fabrication phases favour detailers and checkers. Steel and rebar detailing, piping isometrics and shop drawings arrive as design matures and as contractors and fabricators take over.

Construction and operations phases favour document control and as-built work. This is the quiet, long-term demand: projects must be recorded, handed over and maintained.


Where the Hiring Actually Happens

A large project does not hire a thousand drafters. It spends money in layers.

  1. The owner (a transit agency, utility or developer) hires a small core team.
  2. Engineering and architecture consultants win design contracts and staff them. This is where most CAD, BIM and GIS jobs are created.
  3. Contractors and fabricators hire detailers, coordinators and field engineers.
  4. Specialist subconsultants (survey, geotechnical, environmental, utilities) take pieces of the work.

For your career, the implication is simple: the project is not your employer. The consultants and contractors working on it are. Follow the firms that win the work, not only the project announcements. Job Bank shows that most drafting technologists work in architectural, engineering and design services, which matches this picture. I give the practical steps in How to Apply Directly to Engineering and Architecture Firms: A Step-by-Step Guide.

Job Bank also explains the demand side for civil technologists: in Ontario, it cites significant public-sector infrastructure investment and population growth that is producing significant new residential construction as the main trends affecting employment. In a profile for Québec City, it reported a labour shortage over 2023–2025 for civil engineering technologists.


A Regional Reading

This is my interpretation of the lists above, combined with the labour-market outlook in State of CAD, BIM and GIS Hiring in Canada. It is a reading, not a forecast.

Ontario. The largest concentration of projects: Darlington new nuclear and refurbishment, Bruce Power refurbishment, the Ontario Line, GO Expansion early works, a major hospital build and the Yonge North extension. These are large and long. Yet Job Bank rates the 2025–2027 outlook for drafting technologists in the Toronto region as Very limited, with a labour surplus over the past three years. My reading: the projects will absorb specialists (nuclear, rail, BIM coordination, MEP) more than generalist drafters. If you work in Ontario, specializing matters more than ever. See Which CAD Skills, Software and Certifications Pay More in Canada?

Québec. The Réseau express métropolitain ($9.4 billion on the ReNew list) and the Montréal Metro Blue Line East Extension ($7.6 billion) provide transit work, and Alto and the Contrecoeur terminal are federal priorities. Job Bank rates the drafting outlook as Very limited in Québec, so the same logic applies, and French is a requirement.

British Columbia. LNG Canada Phase 2, Ksi Lisims LNG, the North Coast Transmission Line, the Red Chris mine expansion and Roberts Bank Terminal 2 are on the federal list. Job Bank reported a labour shortage in the Lower Mainland over 2023–2025. My reading: demand from industrial, transmission and port projects meets a market that was already tight.

Alberta and the Prairies. Calgary’s Green Line LRT relaunch is on the ReNew list, and the Prairies carry many mining, energy and corridor projects. Job Bank rates the drafting outlook Moderate in Alberta, Saskatchewan and Manitoba. These are also the provinces where median wages for drafting and GIS are highest, as I show in CAD Salaries by Province: Ontario, Québec, BC, Alberta and More Compared.

The North and Atlantic Canada. The federal list includes the Mackenzie Valley Highway, the Taltson hydro expansion, the Arctic economic and security corridor and the Labrador Trough corridor. These are corridor and energy projects where GIS, survey and remote-site planning dominate. The labour markets are small, and recruitment often depends on relocation.


What This Means for You

If you are a designer or technician

  • Choose a sector, not just a city. Nuclear, transit, transmission, energy and healthcare each reward different skills.
  • Learn the tools that cross over. Civil 3D with GIS, Revit with Navisworks, and AutoCAD with plant or piping tools are the combinations I would bet on. See Top 25 CAD, BIM and GIS Skills Employers Ask For in Canada.
  • Be early. Survey, GIS and corridor roles come first. If you can add them to your profile, you are ahead of the wave.
  • Watch the consultants. Look at which firms win design contracts, and approach them early.

If you are a student or career changer

The best-documented demand is in civil, structural, mechanical and electrical design for infrastructure and energy. Plan to specialize within two to three years. See CAD Specializations Compared: Civil, Architectural, Structural, MEP, Mechanical and GIS.

If you are an employer

Large projects draw experienced people away from the rest of the market and raise salary expectations. Retain your best people early, and plan for your own pipeline, because the competing demand arrives faster than your recruitment cycle.


Risks to the Pipeline

  • Cancellation, delay and rescoping. Early-stage projects such as Alto can change in scale and timing.
  • Financing and approvals. Many projects still depend on investment decisions and regulatory milestones.
  • Cost inflation. Values reported here are estimates and often rise.
  • Capacity limits. Consultants and contractors may be unable to hire as fast as the projects need.
  • Technology. AI and automation may reduce the hours required for routine drafting, which I examine in Will AI Replace CAD Drafters? A Complete Career Impact Guide.

What to Watch

  • Final investment decisions on LNG and mining projects.
  • Construction starts on Alto, the Green Line and transmission lines.
  • Procurement announcements, which identify the consultants and contractors who will hire.
  • The next ReNew Canada Top100 report and further Major Projects Office announcements.
  • Provincial infrastructure budgets, which often move faster than federal programs.

Frequently Asked Questions

Which Canadian infrastructure projects will create the most CAD jobs? Nobody publishes this. By value, the largest are nuclear and transit projects in Ontario and Québec, plus Alto, whose early-stage cost estimate is $60 billion to $90 billion. The hiring happens mostly at consultants and contractors.

Are the Major Projects Office projects under construction? Not necessarily. Referral means a project is being fast-tracked through federal review. Check each project’s status.

Do big projects mean more jobs for drafters? Often for specialists more than for generalists, especially in markets where Job Bank’s outlook for drafting technologists is limited.

Which skills will large projects need? Civil and structural design, discipline coordination, BIM and GIS, and for energy projects piping and plant design. See the table above.

Where is demand strongest? It depends on your discipline. Ontario and Québec for transit and nuclear, British Columbia for energy, transmission and ports, and the Prairies for mining and energy corridors.

How often is this report updated? Annually, with updates when major projects change status.


Sources

Project values are estimates reported by the sources above at the dates they were published. Hiring-needs mappings are the author’s professional judgment.

Projects come and go, but the pattern holds: the people who understand the sequence of work, and prepare one step ahead of it, are the ones who are asked to join.